Work has started on framing out the internal walls in preparation for insulation and plasterboard. Until the roof goes on Dan is not going to put any insulation in - it is just the framing until we are properly watertight.
We now have a mezzanine floor too which appeared really quickly and looks great. Dan has sourced some 150 year old oak floorboards which have been planed and cut into a tongue and groove style. These have gone on top of the framework and Jack has now sanded them. They match the horizontal oak beam very well and I just need to think about what to coat them with. I am thinking of a wax finish.
Follow my progress on planning, designing and building a garden room
Monday, 21 December 2015
Exploring other roofing options
Week Eighteen
We are currently exploring other options regarding the final roof covering. With the zinc quote coming in at over £5,000 we are looking at aluminium and steel alternatives plus slate.
We have looked at Vieozinc (aluminium base with a real zinc layer on top) but the first quote for this has come in at £7,790 plus VAT! When asking why this was much higher than expected, I was told that although the material costs for Vieozinc are cheaper than real zinc, due to the small area to be covered this does not reduce the costs much, plus the labour costs and flashings etc are the same as for zinc, so the overall price is not much cheaper. This quote was much more, so their labour costs etc must be a lot higher.
It does look like zinc though but we are not paying more for this product when it is not the real thing!
We have also found a Swedish steel product called Prelaq Nova Plx which is a heavily galvanised steel coated in zinc. We have made some enquiries about this product but again quotes have come in at higher than real zinc. Very frustrating....
The above image though is exactly the look I want to achieve and has confirmed my feelings that we need to go back to real zinc in the Anthra-zinc shade and get some more quotes....
We are currently exploring other options regarding the final roof covering. With the zinc quote coming in at over £5,000 we are looking at aluminium and steel alternatives plus slate.
We have looked at Vieozinc (aluminium base with a real zinc layer on top) but the first quote for this has come in at £7,790 plus VAT! When asking why this was much higher than expected, I was told that although the material costs for Vieozinc are cheaper than real zinc, due to the small area to be covered this does not reduce the costs much, plus the labour costs and flashings etc are the same as for zinc, so the overall price is not much cheaper. This quote was much more, so their labour costs etc must be a lot higher.
![]() |
| Vieozinc |
It does look like zinc though but we are not paying more for this product when it is not the real thing!
We have also found a Swedish steel product called Prelaq Nova Plx which is a heavily galvanised steel coated in zinc. We have made some enquiries about this product but again quotes have come in at higher than real zinc. Very frustrating....
![]() |
| Prelaq Nova Plx |
Thursday, 10 December 2015
Roofing felt, larch cladding and window
Week Eighteen.
Lots going on at the moment. Dan and Jack have covered the roof in a layer of breathable but waterproof roofing membrane. It will be one of the layers in the roof build up but ideally needs covered soon as it is not designed to be left alone.
Work has also steamed ahead with the larch cladding which seemed to happen really quickly. Our window which we bought months ago has also gone in and we are really pleased with the proportions.
![]() |
| Roofing felt goes on and larch cladding begins |
![]() |
| Guttering line detail |
![]() |
| Our window goes in |
![]() |
| Window and larch cladding |
Wednesday, 9 December 2015
Week Eighteen - capstones removed and lead flashing put in
Week Eighteen.
Following the recommendations from Graham the zinc roofer, Dan has re-thought the guttering at the rear and came to the conclusion that he needed to take the capstones back off and put a full lead flashing through the wall instead of a layer of damp proof course. This will eliminate any worry that rain or roof run off
The capstones of the wall went back on today - on top of a full width lead flashing. The finished roof will sit above the gully and will have a standard plastic guttering catching most of the rain from the roof. The lead will just be a back up to stop any moisture on the capstones getting down into the wall.
Following the recommendations from Graham the zinc roofer, Dan has re-thought the guttering at the rear and came to the conclusion that he needed to take the capstones back off and put a full lead flashing through the wall instead of a layer of damp proof course. This will eliminate any worry that rain or roof run off
The capstones of the wall went back on today - on top of a full width lead flashing. The finished roof will sit above the gully and will have a standard plastic guttering catching most of the rain from the roof. The lead will just be a back up to stop any moisture on the capstones getting down into the wall.
Tuesday, 8 December 2015
Visit from zinc roofing company
Week Seventeen.
We have had a visit from a zinc roofing specialist who came to see the roof in order to provide a quotation. I had been liaising with Graham - the owner of the company for quite a long time - even before the project started and he said that in order to give us an accurate quote, he would come and see the project as soon as the main timbers were in place.
To cut it short, Graham was concerned about a number of issues with the rear part of the roof, especially the construction of the frame and roof in relation to the brick wall at the rear. He said that as zinc sheds water faster than other types of roofing materials, any heavy rain would shoot off the roof and constantly soak the capstones of the wall and therefore make the wall wet and potentially cause water to come into the building at this point. He was also concerned about our lack of scaffolding around the building. His quotation came in at just under £5,300 which is more than we were expecting (we had been expecting a quote in the region of £4,000 for both sheds) so we are currently looking at other options and other zinc roofing companies.
We have had a visit from a zinc roofing specialist who came to see the roof in order to provide a quotation. I had been liaising with Graham - the owner of the company for quite a long time - even before the project started and he said that in order to give us an accurate quote, he would come and see the project as soon as the main timbers were in place.
To cut it short, Graham was concerned about a number of issues with the rear part of the roof, especially the construction of the frame and roof in relation to the brick wall at the rear. He said that as zinc sheds water faster than other types of roofing materials, any heavy rain would shoot off the roof and constantly soak the capstones of the wall and therefore make the wall wet and potentially cause water to come into the building at this point. He was also concerned about our lack of scaffolding around the building. His quotation came in at just under £5,300 which is more than we were expecting (we had been expecting a quote in the region of £4,000 for both sheds) so we are currently looking at other options and other zinc roofing companies.
![]() |
| Dan and Graham discuss the rear guttering issues... |
Wednesday, 2 December 2015
Dwarf walls put up
Week Seventeen.
The dwarf brick walls have gone up but we have made the decision not to put them on the back wall inside the building. They were going to be used to hide the damaged lower courses of the old wall, but we felt that they would have stuck out too much into the room, plus the colour of the reclaimed bricks is much pinker and more orange than the existing wall which is actually quite red lower down. We felt the colour contrast would be too great and have instead chosen to have the lower part of the wall battened and insulated like a mini stud wall with the oak shelf on top and a matching oak skirting board below. We can then simply plaster the gap between and paint it the same as the other walls.
![]() |
| Dwarf walls go up |
Tuesday, 1 December 2015
Week Seventeen - work on roof
Week Seventeen.
Today, work was done on filling in the gap between the rafters so a set of oak lengths were cut to size and inserted between the rafters.
![]() |
| Oak timber inserts between rafters |
![]() |
| View along length of shed |
![]() |
| Close up of oak inserts in roof |