The party wall between our properties was built this week and will be topped with a lower fence panel. The narrow gap will be left as an access point whilst work continues.
Follow my progress on planning, designing and building a garden room
Sunday, 10 January 2016
Tuesday, 5 January 2016
Week Twenty Two - New Year begins
New Year and work continues. I spoke with Dale from Elite Lead today and he is hoping to fit us in fairly soon over a dry weekend. He thinks the job will take two to three days.
Monday, 28 December 2015
Electrics being installed
Week Twenty.
Daniel is going to install my electrics for me and then get them signed off by a registered electrician. I had a good idea of what I wanted and where, but it was good to actually get into the building with Dan and imagine the layout of the furniture so that electrical sockets will be in the correct place.
The mezzanine level will have a double socket with USB ports near where the children will sit - to power a table lamp plus tablets and computers. There will be another double socket on the opposite wall where the TV and games console will be. We have also put in a fixed socket where the 1000w electric panel heater will sit.
The utility room will have power supply for the tumble dryer and freezer (both hidden under counter) plus a double socket at worktop level . We also have three switches next to the door for the outdoor light, main angled spotlights and the LED strip light controller.
Daniel is going to install my electrics for me and then get them signed off by a registered electrician. I had a good idea of what I wanted and where, but it was good to actually get into the building with Dan and imagine the layout of the furniture so that electrical sockets will be in the correct place.
The mezzanine level will have a double socket with USB ports near where the children will sit - to power a table lamp plus tablets and computers. There will be another double socket on the opposite wall where the TV and games console will be. We have also put in a fixed socket where the 1000w electric panel heater will sit.
The utility room will have power supply for the tumble dryer and freezer (both hidden under counter) plus a double socket at worktop level . We also have three switches next to the door for the outdoor light, main angled spotlights and the LED strip light controller.
![]() |
| View of the gable end mezzanine. Timbers in the wall and sockets ready to place glass panel heater. |
![]() |
| Three switches controlling outside light, LED spotlights and LED strips |
![]() |
| Sockets on the wall in the utility area - where the kitchen units will be sited |
Zinc roof agreed at last!
Week Twenty.
After lots more research into finding a zinc roof installer, I sent off another load of e-mails to various companies asking for a quotation. Justin found a Southampton based company via the internet called Elite Lead and they came out to see us last Friday. They were very straightforward and did not seem at all bothered by the slightly complicated rear gutter arrangement which has put others off. As they quite rightly said, their zinc roof will simply run into gutters all the way round. They said that they would ring me later on Friday hopefully with a quote.
Having heard nothing all week, I was itching to ring this morning. I was worried that the lack of contact meant they had had second thoughts. I thought I would leave it until lunchtime, but on the way to Fordingbridge to the dentist, my phone rang on handsfree and it was them! The quote is far more reasonable and actually bang on what we felt it should be. We were basing our estimate on the price of approx £100 per square metre plus VAT. Our roof is approximately 33 square metres. I was so pleased!
I talked to Dale at Elite and we discussed the option of squeezing the work in between Christmas and New Year as they had an available window; however when talking to Dan and looking at the pretty awful weather forecast, we felt that it would be far more sensible to wait until the New Year and find a better weather window. Dan estimates that he has about three days worth of work in order to get the roof ready for the zinc and he needs to work in dry weather. In doing our research, we have found that it is imperative that the timber layers in the roof construction are bone dry as any condensation is very bad news.
After lots more research into finding a zinc roof installer, I sent off another load of e-mails to various companies asking for a quotation. Justin found a Southampton based company via the internet called Elite Lead and they came out to see us last Friday. They were very straightforward and did not seem at all bothered by the slightly complicated rear gutter arrangement which has put others off. As they quite rightly said, their zinc roof will simply run into gutters all the way round. They said that they would ring me later on Friday hopefully with a quote.
Having heard nothing all week, I was itching to ring this morning. I was worried that the lack of contact meant they had had second thoughts. I thought I would leave it until lunchtime, but on the way to Fordingbridge to the dentist, my phone rang on handsfree and it was them! The quote is far more reasonable and actually bang on what we felt it should be. We were basing our estimate on the price of approx £100 per square metre plus VAT. Our roof is approximately 33 square metres. I was so pleased!
I talked to Dale at Elite and we discussed the option of squeezing the work in between Christmas and New Year as they had an available window; however when talking to Dan and looking at the pretty awful weather forecast, we felt that it would be far more sensible to wait until the New Year and find a better weather window. Dan estimates that he has about three days worth of work in order to get the roof ready for the zinc and he needs to work in dry weather. In doing our research, we have found that it is imperative that the timber layers in the roof construction are bone dry as any condensation is very bad news.
![]() |
| Image from Elite Lead website |
Mechanism for sliding storage
Under the mezzanine, I plan to have lots of storage hidden behind doors. My idea is to have a large space with shelving where we can easily access things, plus simply push the lawnmower in. I then would like pull out storage in the form of massive sliding drawers which will contain boxes stacked up. This means that even the boxes at the rear can be easily accessed making it much easier to get hold of items. My dream would be to have perfectly labelled boxes so I can find everything when needed rather than having to rummage through lots of different boxes!
I have found a really strong sliding drawer mechanism called the Titan D which can be supplied in a wide variety of lengths and can carry a substantial weight. The ones I am looking at are 1200mm long and a pair of these can carry up to 95kg. I plan to put a false front on the drawer, so when pushed back inside its housing, it will look like wall panelling and be virtually invisible.
Wednesday, 23 December 2015
Temporary roof in place for the Christmas break
Week Twenty.
Luckily the last day before the Christmas break was dry and sunny. Dan and Jack fixed a brand new heavy duty plastic sheet onto the roof and securely battened it down. We all feel much happier that the building is as waterproof as it can be until the zinc roof goes on. We shouldn't have any more water leaking onto the internal rafters, so they can now properly dry out and be ready for sanding when work resumes in the New Year.
![]() |
| The roof just prior to plastic sheeting going on |
Tuesday, 22 December 2015
Week Twenty - gable end windows
Week Twenty.
We have decided to get some triangular shaped windows put into the oak timbers at the gable end of our building. We feel that it will be an important source of natural light and it would be a shame to cover it over in larch cladding. Dan gave me the measurements required and I made two strong cardboard templates. I ordered the double glazed units from Salisbury Glass - one pane in a satin opaque and the other plain glass as it will give a view into next doors garden so we felt it needed to be obscure glass.
I went to collect them today only to be found that they had been cut according to the length and height measurements given - so rectangular not triangular! It was clear on the order form that they needed to be cut according to the templates supplied, so it is not my problem but it was very annoying to find that I had made a wasted journey and they will now not be ready until well into the New Year....
We have decided to get some triangular shaped windows put into the oak timbers at the gable end of our building. We feel that it will be an important source of natural light and it would be a shame to cover it over in larch cladding. Dan gave me the measurements required and I made two strong cardboard templates. I ordered the double glazed units from Salisbury Glass - one pane in a satin opaque and the other plain glass as it will give a view into next doors garden so we felt it needed to be obscure glass.
I went to collect them today only to be found that they had been cut according to the length and height measurements given - so rectangular not triangular! It was clear on the order form that they needed to be cut according to the templates supplied, so it is not my problem but it was very annoying to find that I had made a wasted journey and they will now not be ready until well into the New Year....
![]() |
| View of gable end which will be glazed |