Week Three.
The guys have worked so hard this week - they reckon around 50 tonnes of soil have been removed in total!
Trenches were dug for drainage pipes and they were then back filled with shingle. The foundation trenches were then dug and filled with concrete.
Pipes ready to go into the ground to feed rainwater from roof into soakaway |
Gravel lines mark the location of pipes buried in the ground which will take rainwater from the roof |
Freshly poured concrete foundations and now covered over soakaway (gravel area bottom centre) |