Showing posts with label railway sleeper steps. Show all posts
Showing posts with label railway sleeper steps. Show all posts

Sunday, 27 September 2015

Deck lights installed

Week Six.
 
I am thrilled to bits with the square decking lights. We ended up buying a second pack of eight which we will split with our neighbour, so that we each have twelve each.  We are having three put into the top of the retaining wall and nine put into the faces of the steps. They look amazing!
 
 
We will have a total of twelve deck lights - nine in the steps and three in the retaining wall
View of the three deck lights in the retaining wall

Railway sleeper steps

Week Six.
 
Dan and Jack have worked on installing the railway sleeper steps this week. We have had excellent weather so long may it continue!  We are having three long steps which will be formed from sleepers up on their short edge and are putting in decking lights.
 
View of bottom two steps plus deck lights installed in steps and side wall

Friday, 18 September 2015

Railway sleepers have arrived

Week Five.

The railway sleepers arrived yesterday. We have chosen new oak sleepers and our neighbour went for the traditional reclaimed style. We bought Everbuild Wood Preserver in clear and I got to work almost straight away in giving them at least two coats. It was a lovely job to do - just sloshing the liquid on very generously allowing it to soak in.
The oak sleepers placed in the garden
Everbuild Wood Preserver - clear
Work starting on putting the wood preserve on the oak sleepers