Week Fourteen.
Work began today on the central wall between the two sheds. It is being built using structural concrete blocks - 100 of which we were given to us free by a neighbour. A brick pier has also been built at the front of the building which will act as structural support for the timber beams and also disguise the fact that the angle of the garden wall and therefore the sheds are at a different angle to the fence line and are not parallel to the houses. Unfortunately, we will not see much if any of this brickwork on our side but it will be visible above the lower level fence when that is added at the end of the project.
Construction of central wall with brick pier to the front |